Skip to content
06 / Commercial · Commercial & strata

Maintenance Contracts.

SQUARE.01
FIELD.APV ARRAY

Ongoing electrical maintenance keeps your building safe, compliant, and operating without expensive emergency call-outs. We offer fixed-price maintenance contracts for commercial and strata clients.

02How the job runs

From enquiry to certificate.

Same five steps every time. Predictable, documented, and finished with a Certificate of Electrical Safety lodged with ESV.

  1. 01

    Enquiry

    Tell us the scope by phone or form. Same-day reply during business hours.

  2. 02

    Site visit

    We come on site to inspect, scope properly, and walk through options.

  3. 03

    Written quote

    Itemised, fixed-price quote in your inbox within one business day.

  4. 04

    Install

    Booked at your convenience. Tidy worksite, no hidden costs.

  5. 05

    Certified

    Certificate of Electrical Safety lodged with Energy Safe Victoria.

03Scope & standards

What's in a maintenance contracts job.

Preventative electrical maintenance identifies issues before they become outages or safety incidents. For commercial tenants, property managers, and strata committees, a scheduled maintenance contract with Millar Electrics means a single point of contact, predictable costs, priority response, and complete documentation for compliance purposes. We tailor maintenance programmes to the size and complexity of your building. A small commercial tenancy may need an annual inspection and RCD test; a large strata complex with common area infrastructure may require quarterly visits and a broader scope.

Why a contract beats reactive call-outs

Reactive electrical work is more expensive and more disruptive. A failed RCD that causes an unplanned outage during trading hours costs lost sales; emergency-rate after-hours work costs a multiple of scheduled rates. A maintenance programme catches degraded RCDs, loose terminations, and overloaded circuits before they fail — and locks in priority response when something does go wrong.

What a contract typically covers

We agree the scope upfront based on your building. Common inclusions: scheduled RCD testing to AS/NZS 3760, emergency and exit lighting tests (six-monthly function and annual full-duration to AS 2293), thermal imaging of switchboards to detect hot spots before they cause faults, switchboard inspections, and minor repairs handled during the visit.

Reporting and compliance

Every visit ends with a written report covering tests performed, results, any faults found, and remediation undertaken. Annual summaries are provided in a format suitable for owners corporation AGMs, insurer audits, and building safety files. Records are retained indefinitely so you can produce them on demand.

04Inclusions

What every job includes.

07 line items, every time. No surprise add-ons after acceptance.

  • 01Scheduled periodic inspections to agreed frequency
  • 02RCD testing and tagging to AS/NZS 3760
  • 03Emergency and exit lighting testing to AS 2293
  • 04Switchboard inspection and thermal imaging
  • 05Fault identification and minor repairs during inspections
  • 06Priority response for urgent call-outs
  • 07Detailed inspection reports and compliance records
05 / No-obligation quote

Free written quote in one business day.

We come to site, scope it, and email you a fixed price — no surprises after acceptance.

06Common questions

Before you book.

Answers to the questions we get most often. Anything not covered? Send through an enquiry — we'll reply same business day.

10Appendix

Related & spec.

BWhy Millar Electrics
Licensed
REC-22849
Insured
Public liability
Compliance
COES issued
Worksite
Tidy, no surprises
Coverage
Melbourne's east
Established
2016
10 / GET IN TOUCH

Ready to
book maintenance contracts?

Free quotes. We'll reply inside four business hours, or call straight back if you'd rather talk.