Skip to content

Field notes: 35 articles

Electrical advicefrom the tools.

Practical writing from real Melbourne jobs: wiring rules that catch people out, switchboard eras that hide surprises, and what the standards behind the work actually say.

1128 August 2026

Outdoor lighting: what’s weatherproof and what’s only water-resistant

IP44, IP54, IP65, IP66: which outdoor lighting IP rating is right for which location in a Melbourne home, and why getting it wrong costs more than getting it right first time.

↗ Read
1219 August 2026

Induction cooktop installation: what’s involved electrically and why a sparky needs to do it

Induction cooktops draw 7–14kW and need a dedicated circuit sized to the appliance, commonly 32–50A. Here’s what the electrical work involves and why getting it right before you buy matters.

↗ Read
1310 August 2026

Home battery storage: what the electrical installation actually involves

AC-coupled and DC-coupled battery systems each have different implications at the switchboard. Here’s what the installation actually involves: changeover equipment, backup wiring, AS/NZS 5139, and Virtual Power Plant connections.

↗ Read
141 August 2026

Solar inverter upgrades: when your old inverter is holding back your system

Most Melbourne solar systems installed between 2010 and 2016 have inverters at or past their design life. Here’s what signs of underperformance look like, what AS/NZS 4777 compliance requires, and what a hybrid inverter adds.

↗ Read
1523 July 2026

EV charger load management: what it is and when you need it

Load management throttles your EV charger when household demand is high, keeping total draw within your supply limit. Here’s how CT clamps, software-based control, and solar integration work in practice.

↗ Read
1614 July 2026

Getting your home ready for an EV charger: what the electrician checks before installation

Before your EV charger goes in, an electrician needs to assess your switchboard capacity, consumer mains size, earthing, and cable run distance. Here’s what that covers and why it determines what charger you can actually run.

↗ Read
175 July 2026

Asbestos in meter boards: what Melbourne homeowners need to know

Many Melbourne homes built before 1985 have asbestos-containing material in the meter board or switchboard backing. Electricians can’t work around friable asbestos. Here’s the correct process: asbestos assessment, licensed removal, then electrical upgrade.

↗ Read
1826 June 2026

Consumer mains: what they are, when they need replacing, and what the job involves

The consumer mains cable connects the electricity meter to your main switchboard. Undersized cables, asbestos jacketing, and degraded insulation all cause problems. Here’s when replacement is needed and what the Victorian process involves.

↗ Read
1917 June 2026

VIR cable: what it is, why it’s in pre-1970 Melbourne homes, and what to do about it

Vulcanised india rubber wiring is common in Mitcham, Blackburn, and Box Hill homes built before 1970. The insulation becomes brittle and cracks over time. Here’s how it fails, how to spot it, and what to do about it.

↗ Read
208 June 2026

Ceramic fuse vs circuit breaker: why the difference matters more than you think

Ceramic fuses are common in Melbourne’s 1940s–1970s homes. They can be over-fused, trip slowly, and offer no arc fault protection. Here’s what modern circuit breakers do instead, and what a switchboard upgrade involves.

↗ Read
06 / GET IN TOUCH

Got a job for us?

Free quotes. We'll reply inside four business hours, or call straight back if you'd rather talk.